Why choose T2

1

Adjustable stacking channels according to mould configuration

2

Friction devices to prevent containers from falling

3

Extraction bar manufactured according to mould configuration

4

Adjustable bar stroke to suit container height

How it works

The containers are trimmed, stacked and counted directly by the trimming press until the preset quantity is reached.

Once the programmed number of pieces has been reached, the press GEP device performs an additional stroke, separating the completed bundle from the next one.

The bundles are held within the stacking channels, ready for transfer to the next stage.

A pushing device picks up the bundle and transfers it from the X-axis multi-lane unit to the Y-axis multi-lane unit.

The Y-axis multi-lane unit automatically advances by one channel pitch, positioning the bundle for discharge.

The Z-axis pushes the bundle into the packaging machine, ensuring precise transfer synchronized with the production cycle.

Technical specification

Overall dimensions, mm8715 × 4915 × 2260
Weight, kg850
Power consumption, kW20
Maximum bundle speed, bundles/min1–12
Maximum container dimensions, mm380 × 400
Maximum bundle length, mm1200
Product discharge height, mm950
Static load on supports, kg/cm²1.2
Compressed air connection1/2"

Fotogallery

Video gallery

Related products